How long does new pool construction typically take?

May 15, 2024

How Long Does It Take to Construct a New Swimming Pool?

two workers building a swimming pool leveling out the concrete

The Timeline for Building a New Pool: What to Expect

Building a new pool is an exciting investment that promises endless enjoyment for you and your family. However, understanding the construction timeline is essential for managing expectations and planning accordingly. In this guide, we’ll walk you through the typical stages of new pool construction, highlight factors that can influence the timeline, and provide insights specific to the Loomis, CA area.


Typical Stages of Pool Construction

1. Design and Planning (1-3 Weeks):

The first stage involves collaborating with a pool contractor to design your custom pool. This includes selecting the shape, size, depth, and additional features like spas, grottos, or special lighting. Finalizing the design and obtaining necessary permits can take between one to three weeks.

2. Excavation (1-2 Weeks):

Once the design is approved and permits are in place, excavation begins. This stage involves digging the hole for the pool and typically takes one to two weeks, depending on the pool size and site conditions.

3. Structural Work (2-4 Weeks):

Following excavation, the pool’s structure is constructed. This involves setting up the steel framework, plumbing, and electrical systems. Depending on the complexity of the design and any custom features, this stage can take two to four weeks.

4. Installation of Shell (1-3 Weeks):

The next step is installing the pool shell, which could be made of concrete (gunite), fiberglass, or vinyl. Concrete pools require more time due to the curing process, while fiberglass and vinyl can be installed more quickly. This stage generally takes one to three weeks.

5. Finishing Touches (2-4 Weeks):

Finishing touches include tiling, coping, and interior finishes such as plaster, pebble, or tile. This stage also covers the installation of decking, landscaping, and any additional features like waterfalls or fire pits. This process typically takes two to four weeks.

6. Filling and Testing (1 Week):

The final step involves filling the pool with water and testing all systems to ensure everything is functioning correctly. This stage usually takes about a week.


Factors Influencing the Construction Timeline

Weather Conditions:

In Loomis, CA, the weather can significantly impact the construction timeline. Rain or extreme heat can delay certain stages, particularly excavation and structural work.

Permit Approvals:

Obtaining permits from local authorities can sometimes take longer than anticipated, especially if there are specific zoning laws or regulations in place. Starting the permit process early can help mitigate delays.

Complexity of Design:

Custom features such as spas, grottos, intricate landscaping, or advanced lighting systems can extend the construction timeline due to their complexity.

Availability of Materials and Labor:

Delays in material deliveries or shortages of skilled labor can also impact the timeline. Working with a reputable contractor who has strong industry connections can help minimize these delays.


Conclusion

Building a new pool is a multifaceted project that involves several stages, each with its own timeline. On average, new pool construction takes about 8 to 12 weeks from design to completion. However, factors like weather, permit approvals, and design complexity can influence this timeline. Understanding these stages and potential delays can help you plan better and maintain realistic expectations.

For residents of Loomis, CA, partnering with a trusted contractor like Prestigious Pools ensures a smooth construction process and timely completion of your dream pool. With careful planning and the right expertise, you’ll soon be enjoying your new backyard oasis.

Discover the essential questions to ask a pool contractor before starting your pool project. Ensure
July 3, 2024
Before hiring a pool contractor, it’s crucial to ask the right questions. Learn what to inquire about to ensure your pool project is a success from start to finish.
woman pushing herself out of a pool
May 30, 2024
Adding a pool to your new house can enhance your lifestyle and increase property value. Learn the key factors to consider before making your decision.
Backyard pool with grass, hardscaping, and outdoor space objects
May 22, 2024
Searching for a reliable pool contractor? Learn the best methods and resources to find a qualified pool contractor in Loomis, CA, and surrounding areas.
More Posts
Share by: